Skip to content

Maryland · Chesapeake Bay Bridge · Archive

Bay Bridge status history

Revisit a day on the bridge. Browse saved closures, traffic advisories, daily recaps, and BaySpan recordings. All dates and times are Eastern.

Check current bridge conditions →

Monday, June 8, 2026

Jump to today

Daily recap

Monday Commute Marred by Afternoon Construction and Lane Closures

14 advisoriesPeak EB 21mPeak WB 14m

Eastbound travel saw significant congestion at midday, peaking at 21 minutes around 4:00 PM with a 3-mile backup extending to Exit 29B (Cape St. Claire Road). Earlier, a right-lane closure for roadwork caused 2.5-mile delays from Exit 30 between 12:42 PM and 1:30 PM. Westbound traffic also faced a 1.5-mile backup at Exit 38a (Duke Street) during the 2:00 PM hour as crews closed the left lane to discontinue two-way operations.

33 updates logged

  1. 11:12 PMAll clear

    There are currently no backups or delays, and traffic is flowing normally in both directions. All vehicles are being diverted to the westbound bridge, which is operating with one lane open for eastbound travel and one lane open for westbound travel. This configuration is in place because the eastbound bridge is closed for roadwork and the center lane of the westbound bridge is closed as a buffer.

    Listen to BaySpan
  2. 10:12 PMAll clear

    As of 10:21 p.m. on Monday, June 8th, there are no backups or delays on or approaching the Bay Bridge. Traffic is currently limited to one lane eastbound and one lane westbound. The eastbound bridge is closed for roadwork, and the center lane of the westbound bridge is closed as a buffer lane.

    Listen to BaySpan
  3. 9:12 PMAll clear

    As of 9:21 p.m. on Monday, June 8th, traffic is moving smoothly with no backups or delays approaching the Bay Bridge in either direction. Eastbound and westbound travel times remain normal. Although the left lane on the westbound bridge is closed to discontinue two-way traffic operations, it is not currently impacting the flow of traffic.

    Listen to BaySpan
  4. 8:12 PMAll clear

    As of Monday, June 8th at 8:21 p.m., there are no backups or delays in either direction on the Bay Bridge. Traffic is moving normally eastbound and westbound. While the left lane is closed on the westbound bridge to discontinue two-way traffic, it is currently not impacting travel times.

    Listen to BaySpan
  5. 7:12 PMAll clear

    Traffic is currently clear with no backups or delays approaching the Bay Bridge in either direction. While the left lane is closed to discontinue two-way traffic, travel times remain normal.

    Listen to BaySpan
  6. 6:12 PMAll clear

    As of 6:21 p.m. on Monday, June 8th, there are no traffic delays in either direction. The bridge is currently operating with three lanes open eastbound and two lanes open westbound, and travel times are normal.

    Listen to BaySpan
  7. 5:12 PMAll clear

    Traffic is currently clear with no delays in either direction as of Monday at 5:21 p.m. There are three lanes operating eastbound and two lanes open westbound, with travel times remaining at normal levels.

    Listen to BaySpan
  8. 4:57 PMTraffic advisory

    Eastbound traffic is currently experiencing delays starting at Exit 31 (Whitehall Road), approximately 1.5 miles from the bridge. Westbound traffic is clear with no reported delays. There are currently three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  9. 4:42 PMTraffic advisory

    As of Monday, June 8th at 4:51 p.m., eastbound US 50 is experiencing a three-mile delay beginning at Exit 29B (Cape St. Claire Road). There are currently three lanes open for eastbound travel. Westbound traffic remains clear with two lanes open and normal travel times.

    Listen to BaySpan
  10. 4:27 PMTraffic advisory

    Eastbound traffic is currently backed up for 1.5 miles starting at Exit 31 (Whitehall Road), with travel times running significantly higher than normal. Westbound traffic remains clear with no delays. The bridge is currently operating with three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  11. 4:12 PMTraffic advisory

    Eastbound traffic is experiencing delays starting at exit 31 (Whitehall Road), approximately 1.5 miles from the bridge. There are currently three lanes open eastbound. Westbound traffic remains clear with two lanes open.

    Listen to BaySpan
  12. 3:57 PMTraffic advisory

    As of 4:00 p.m. on Monday, June 8th, eastbound traffic is experiencing delays starting at Exit 31 (Whitehall Road), roughly 1.5 miles from the bridge. Westbound traffic is currently moving normally with no delays reported.

    Listen to BaySpan
  13. 3:42 PMTraffic advisory

    As of 3:51 p.m. on Monday, June 8th, eastbound traffic is experiencing delays starting at Exit 31 (Whitehall Road), approximately 1.5 miles from the bridge. Westbound traffic is currently clear with no reported delays.

    Listen to BaySpan
  14. 2:42 PMAll clear

    There are currently no backups approaching the Bay Bridge in either direction, with traffic moving at normal speeds. For those traveling over the weekend, the best times to cross are Friday before 10 a.m. or after 10 p.m., Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

    Listen to BaySpan
  15. 2:27 PMTraffic advisory

    Westbound traffic is experiencing a 1.5-mile backup starting at Exit 38a (Duke Street) because the left lane on the bridge is closed to discontinue two-way traffic. With only the two right lanes open, westbound travel times are currently double the usual duration. Eastbound traffic is moving normally with no delays.

    Listen to BaySpan
  16. 2:12 PMTraffic advisory

    Westbound traffic is currently delayed for 1.5 miles starting at Exit 38a (Duke Street). The left lane on the bridge is closed to discontinue two-way traffic, leaving only the two right lanes open. Eastbound traffic remains clear with no delays.

    Listen to BaySpan
  17. 1:57 PMTraffic advisory

    Westbound traffic is experiencing delays beginning at Exit 38a (Duke Street), approximately 1.5 miles from the bridge. Eastbound travel is currently clear with no delays. The bridge is operating with three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  18. 1:42 PMTraffic advisory

    Westbound traffic is experiencing a 1.5-mile delay starting at Exit 38a (Duke Street). Eastbound travel is currently clear with no delays. The bridge is operating with three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  19. 1:27 PMTraffic advisory

    Eastbound traffic is currently experiencing a 2.5-mile delay starting at Exit 30 (Whitehall Road) due to the right lane being closed for roadwork. Westbound travel remains normal with no delays. Both directions are currently operating with two lanes open.

    Listen to BaySpan
  20. 1:12 PMTraffic advisory

    Eastbound traffic is currently delayed for 2.5 miles starting at Exit 30 (Whitehall Road) due to a right lane closure for roadworks on the bridge. Westbound traffic remains normal with no reported delays.

    Listen to BaySpan
  21. 12:57 PMTraffic advisory

    Eastbound traffic is experiencing a 2.5-mile delay starting at Exit 30 (Whitehall Road) due to road work closing the right lane on the bridge. There are currently two lanes open in each direction, and westbound traffic is moving normally with no delays.

    Listen to BaySpan
  22. 12:42 PMTraffic advisory

    Eastbound traffic is experiencing delays starting at Exit 30 (Whitehall Road), roughly 2.5 miles from the bridge. This backup is due to roadwork, which has the right lane closed on the eastbound span. Currently, the bridge is operating with two lanes open in each direction. Westbound traffic remains normal with no reported delays.

    Listen to BaySpan
  23. 10:42 AMAll clear

    As of 10:51 a.m. on Monday, June 8, there are no backups or delays in either direction on the Bay Bridge. Traffic is moving at typical speeds, even with the westbound left lane closed for two-way traffic preparation.

    Listen to BaySpan
  24. 9:42 AMAll clear

    There are currently no backups approaching the Bay Bridge in either direction, with traffic moving at normal speeds. For those planning weekend travel, the best times to cross are Friday before 10 a.m. or after 10 p.m., Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

    Listen to BaySpan
  25. 8:47 AMAll clear

    As of 8:56 a.m. on Monday, June 8th, there are no backups approaching the bridge in either direction, and travel times remain normal. For those planning weekend travel, the best times to cross are Friday and Sunday before 10 a.m. or after 10 p.m., and Saturday before 7 a.m. or after 5 p.m.

    Listen to BaySpan
  26. 7:47 AMAll clear

    Currently, there are no backups approaching the Bay Bridge in either direction, and travel times are normal. For those planning weekend travel, the best times to cross are Friday before 10 a.m. and after 10 p.m., Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.

    Listen to BaySpan
  27. 6:47 AMAll clear

    There are currently no backups approaching the Bay Bridge in either direction as of 6:56 a.m. on Monday, June 8th, and traffic is moving at normal speeds. For those planning weekend travel, the best times to cross are Friday before 10 a.m. or after 10 p.m., Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

    Listen to BaySpan
  28. 5:48 AMAll clear

    There are currently no backups approaching the Bay Bridge in either direction as of 5:56 a.m. on Monday, June 8th. For those planning weekend travel, the best times to avoid congestion are Friday before 10 a.m. and after 10 p.m., Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.

    Listen to BaySpan
  29. 4:47 AMAll clear

    Currently, there are no backups approaching the Bay Bridge in either direction, and traffic is moving at normal speeds. For those planning travel later this weekend, the best times to cross are Friday before 10 a.m. or after 10 p.m., Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

    Listen to BaySpan
  30. 3:47 AMAll clear

    No backups or delays are currently reported at the Bay Bridge, with travel times remaining normal in both directions. The westbound bridge is closed for road work, resulting in a traffic pattern of one lane eastbound and one lane westbound on the single open span.

    Listen to BaySpan
  31. 2:47 AMAll clear

    There are currently no backups or delays on or approaching the Bay Bridge. Traffic is moving at normal speeds despite the westbound bridge being closed for road work, with travel reduced to one lane in each direction.

    Listen to BaySpan
  32. 1:47 AMAll clear

    As of 1:56 a.m. on Monday, June 8th, there are no backups or delays on or approaching the bridge. Traffic is currently flowing at normal speeds in both directions. The westbound bridge is closed for road work, with travel restricted to one lane eastbound and one lane westbound on the remaining span.

    Listen to BaySpan
  33. 12:47 AMAll clear

    Traffic is currently clear with no backups or delays approaching the Bay Bridge. As of early Monday morning, travel times remain normal in both directions. The westbound bridge is closed for roadwork, with traffic flow currently reduced to one lane eastbound and one lane westbound.

    Listen to BaySpan