Skip to content

Maryland · Chesapeake Bay Bridge · Archive

Bay Bridge status history

Revisit a day on the bridge. Browse saved closures, traffic advisories, daily recaps, BaySpan recordings, and camera photos and videos from notable updates. All dates and times are Eastern.

Check current bridge conditions →

Friday, May 8, 2026

Jump to today

84 updates logged

  1. 11:47 PMWind advisory

    There are currently no delays at the Bay Bridge in either direction, with traffic flowing at normal speeds. The bridge is operating under a wind warning with sustained wind speeds between 30 and 39 mph. Drivers of house trailers, box trailers, and other vehicles vulnerable to high winds should exercise extra caution while crossing.

    Listen to BaySpan
  2. 11:32 PMWind advisory

    There are currently no delays in either direction at the Bay Bridge, and travel times remain within normal ranges. The bridge is operating under a wind warning with sustained speeds between 30 and 39 mph. Drivers of house trailers, box trailers, and other vehicles vulnerable to high winds should exercise extra caution during the crossing.

    Listen to BaySpan
  3. 11:17 PMWind advisory

    There are currently no delays at the Bay Bridge in either direction, and traffic is moving at normal speeds. The bridge is operating under a wind warning with sustained speeds between 30 and 39 mph. Drivers of house trailers, box trailers, and other wind-vulnerable vehicles are advised to use caution when crossing.

    Listen to BaySpan
  4. 11:02 PMWind advisory

    There are no delays currently reported at the Bay Bridge in either direction. As of Friday at 11:11 pm, traffic is flowing normally. However, the bridge is operating under wind warnings with sustained speeds between 30 and 39 mph. Drivers of house trailers, box trailers, and other wind-vulnerable vehicles should use extra caution when crossing.

    Listen to BaySpan
  5. 11:02 PMWind advisory

    There are no delays currently reported at the Bay Bridge in either direction. As of Friday at 11:11 pm, traffic is flowing normally. However, the bridge is operating under wind warnings with sustained speeds between 30 and 39 mph. Drivers of house trailers, box trailers, and other wind-vulnerable vehicles should use extra caution when crossing.

    Listen to BaySpan
  6. 10:47 PMWind advisory

    Traffic is moving at normal speeds with no delays in either direction at the Bay Bridge. The bridge is currently operating under a wind warning, with sustained wind speeds between 30 and 39 miles per hour. Drivers of box trailers, house trailers, and other wind-vulnerable vehicles should exercise extra caution while crossing.

    Listen to BaySpan
  7. 9:47 PMAll clear

    There are currently no backups approaching the bridge in either direction. For those traveling this weekend, the best times to head out are Friday before 10 a.m. and after 10 p.m., Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.

    Listen to BaySpan
  8. 9:47 PMAll clear

    There are currently no backups approaching the bridge in either direction. For those traveling this weekend, the best times to head out are Friday before 10 a.m. and after 10 p.m., Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.

    Listen to BaySpan
  9. 8:52 PMAll clear

    Traffic is currently clear with no backups approaching the Bay Bridge in either direction. For those traveling over the weekend, the best times to head out are Friday before 10 a.m. and after 10 p.m., Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.

    Listen to BaySpan
  10. 8:52 PMAll clear

    Traffic is currently clear with no backups approaching the Bay Bridge in either direction. For those traveling over the weekend, the best times to head out are Friday before 10 a.m. and after 10 p.m., Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.

    Listen to BaySpan
  11. 8:37 PMIssue reported

    As of Friday, May 8th at 8:46 p.m., there are currently no backups or delays on or approaching the Bay Bridge in either direction. Traffic is moving at normal speeds both eastbound and westbound. Note that the left lane on the bridge is closed westbound to discontinue two-way traffic flow.

    Listen to BaySpan
  12. 8:37 PMIssue reported

    As of Friday, May 8th at 8:46 p.m., there are currently no backups or delays on or approaching the Bay Bridge in either direction. Traffic is moving at normal speeds both eastbound and westbound. Note that the left lane on the bridge is closed westbound to discontinue two-way traffic flow.

    Listen to BaySpan
  13. 8:22 PMIssue reported

    As of 8:31 p.m. on Friday, May 8th, there are currently no backups or delays at the Bay Bridge in either direction. Both eastbound and westbound traffic are moving at normal speeds. Although the left lane on the westbound span is closed to transition away from two-way traffic operations, travel remains clear.

    Listen to BaySpan
  14. 8:22 PMIssue reported

    As of 8:31 p.m. on Friday, May 8th, there are currently no backups or delays at the Bay Bridge in either direction. Both eastbound and westbound traffic are moving at normal speeds. Although the left lane on the westbound span is closed to transition away from two-way traffic operations, travel remains clear.

    Listen to BaySpan
  15. 7:21 PMAll clear

    As of Friday evening, traffic is currently clear with no delays in either direction. There are three lanes open eastbound and two lanes open westbound, with travel times holding at normal durations for both sides of the bridge.

    Listen to BaySpan
  16. 6:26 PMAll clear

    As of Friday, May 8th at 6:36 PM, traffic is moving normally with no delays in either direction. There are currently three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  17. 6:12 PMTraffic advisory

    As of 6:21 PM on Friday, May 8th, eastbound travelers heading toward the Severn River Bridge are experiencing delays starting at Exit 27, approximately a half-mile from the bridge. Traffic on the Bay Bridge itself is currently clear with no delays in either direction. The bridge is operating with three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  18. 5:57 PMTraffic advisory

    Westbound traffic is experiencing delays beginning at the Exit 37 Route 8 overpass, approximately 0.6 miles from the bridge. While traffic is currently clear on the Bay Bridge heading eastbound, motorists traveling toward the Severn River Bridge should expect delays starting at Exit 27. The bridge is currently operating with three lanes open eastbound and two lanes westbound, with travel times in both directions remaining near normal.

    Listen to BaySpan
  19. 5:42 PMTraffic advisory

    Westbound traffic is currently experiencing delays starting at Exit 38A (Duke Street), approximately 1.5 miles from the bridge. While travel remains clear for eastbound traffic at the Bay Bridge, those heading eastbound toward the Severn River Bridge should expect delays starting at Exit 27. There are currently three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  20. 5:27 PMTraffic advisory

    Westbound traffic is currently backed up for 1.5 miles, with delays starting at Exit 38a (Duke Street). While the eastbound span of the Bay Bridge remains clear, motorists traveling eastbound toward the Severn River Bridge are experiencing delays beginning at Exit 27. There are currently three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  21. 5:27 PMTraffic advisory

    Westbound traffic is currently backed up for 1.5 miles, with delays starting at Exit 38a (Duke Street). While the eastbound span of the Bay Bridge remains clear, motorists traveling eastbound toward the Severn River Bridge are experiencing delays beginning at Exit 27. There are currently three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  22. 5:12 PMTraffic advisory

    Westbound traffic is currently backed up for 1.5 miles starting at Exit 38A (Duke Street). Additionally, travelers heading eastbound are seeing delays starting at Exit 27 near the Severn River Bridge. Traffic is flowing normally for those crossing the Bay Bridge eastbound. The bridge is currently operating with three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  23. 4:57 PMTraffic advisory

    Westbound traffic is currently experiencing delays starting at Exit 38a (Duke Street), roughly 1.5 miles from the Bay Bridge. Eastbound traffic is currently clear. The bridge is operating with three lanes open eastbound and two lanes open westbound. Additionally, there is a backup for eastbound travelers approaching the Severn River Bridge, with delays starting at Exit 27.

    Listen to BaySpan
  24. 4:57 PMTraffic advisory

    Westbound traffic is currently experiencing delays starting at Exit 38a (Duke Street), roughly 1.5 miles from the Bay Bridge. Eastbound traffic is currently clear. The bridge is operating with three lanes open eastbound and two lanes open westbound. Additionally, there is a backup for eastbound travelers approaching the Severn River Bridge, with delays starting at Exit 27.

    Listen to BaySpan
  25. 4:47 PMTraffic advisory

    Westbound traffic is experiencing delays starting at Exit 38a (Duke Street), roughly 1.5 miles from the bridge. While eastbound traffic is currently clear at the Bay Bridge, there is a backup approaching the Severn River Bridge starting at Exit 27. Operations are currently running with three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  26. 4:32 PMTraffic advisory

    As of Friday, May 8th, at 4:41 p.m., westbound traffic is delayed for 1.5 miles starting at Exit 38a (Duke Street). While eastbound travel on the Bay Bridge is currently clear, there is a backup further back at the Severn River Bridge starting at Exit 27. The bridge is operating with three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  27. 4:17 PMTraffic advisory

    Westbound traffic is experiencing delays starting at the Route 8 overpass (Exit 37), approximately 0.6 miles from the bridge. While eastbound traffic on the bridge itself is clear, motorists traveling eastbound toward the Severn River Bridge will encounter delays starting at Exit 27. The bridge is currently operating with three lanes eastbound and two lanes westbound.

    Listen to BaySpan
  28. 4:02 PMTraffic advisory

    Westbound traffic is currently delayed for 1.5 miles starting at Exit 38A (Duke Street). There are two lanes open westbound. While bridge traffic is clear heading eastbound with three lanes open, motorists should expect a backup at the Severn River Bridge beginning at Exit 27, approximately a half-mile from the bridge.

    Listen to BaySpan
  29. 3:47 PMTraffic advisory

    Westbound traffic is currently experiencing delays starting at Exit 38A (Duke Street), approximately 1.5 miles from the bridge. While eastbound travel on the Bay Bridge remains clear, motorists heading eastbound toward the Severn River Bridge will encounter a backup beginning at Exit 27. The bridge is operating with three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  30. 3:32 PMTraffic advisory

    Westbound traffic is currently experiencing delays starting at exit 38A (Duke Street), approximately 1.5 miles from the bridge. There are currently two lanes open westbound. Eastbound traffic is moving normally with three lanes in operation and no reported delays.

    Listen to BaySpan
  31. 3:32 PMTraffic advisory

    Westbound traffic is currently experiencing delays starting at exit 38A (Duke Street), approximately 1.5 miles from the bridge. There are currently two lanes open westbound. Eastbound traffic is moving normally with three lanes in operation and no reported delays.

    Listen to BaySpan
  32. 3:17 PMTraffic advisory

    As of 3:26 p.m. on Friday, May 8th, westbound traffic is experiencing delays starting at Exit 38a (Duke Street), approximately 1.5 miles from the bridge. Eastbound traffic is currently moving normally with no reported delays. The bridge is operating with three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  33. 3:17 PMTraffic advisory

    As of 3:26 p.m. on Friday, May 8th, westbound traffic is experiencing delays starting at Exit 38a (Duke Street), approximately 1.5 miles from the bridge. Eastbound traffic is currently moving normally with no reported delays. The bridge is operating with three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  34. 3:02 PMTraffic advisory

    As of 3:11 PM on Friday, westbound traffic is experiencing a 1.5-mile delay starting at Exit 38A (Duke Street). There are currently two lanes open for westbound travel. Eastbound traffic remains clear with three lanes in operation.

    Listen to BaySpan
  35. 3:02 PMTraffic advisory

    As of 3:11 PM on Friday, westbound traffic is experiencing a 1.5-mile delay starting at Exit 38A (Duke Street). There are currently two lanes open for westbound travel. Eastbound traffic remains clear with three lanes in operation.

    Listen to BaySpan
  36. 2:47 PMTraffic advisory

    Westbound traffic is currently experiencing delays beginning at Exit 38A (Duke Street), approximately 1.5 miles from the bridge. Eastbound travel remains clear with no reported delays. There are currently three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  37. 2:47 PMTraffic advisory

    Westbound traffic is currently experiencing delays beginning at Exit 38A (Duke Street), approximately 1.5 miles from the bridge. Eastbound travel remains clear with no reported delays. There are currently three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  38. 2:27 PMTraffic advisory

    Both eastbound and westbound traffic are currently experiencing delays. Eastbound congestion begins at Exit 32 (Sandy Point), approximately one mile from the bridge. Westbound delays start at Exit 38a (Duke Street), extending 1.5 miles. There are currently three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  39. 2:07 PMTraffic advisory

    As of 2:16 p.m. on Friday, May 8th, traffic is experiencing delays in both directions. Eastbound congestion begins at Exit 32 (Sandy Point), approximately one mile from the bridge. Westbound delays start at Exit 38A (Duke Street), about 1.5 miles from the bridge. Currently, there are three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  40. 1:57 PMTraffic advisory

    As of 2:06 p.m. on Friday, May 8th, traffic is delayed in both directions at the Bay Bridge.

    Eastbound traffic is backed up for one mile, starting at Exit 32 (Sandy Point), with three lanes currently open. Westbound traffic is experiencing a 1.5-mile backup starting at Exit 38A (Duke Street) with two lanes open.

    Listen to BaySpan
  41. 1:57 PMTraffic advisory

    As of 2:06 p.m. on Friday, May 8th, traffic is delayed in both directions at the Bay Bridge.

    Eastbound traffic is backed up for one mile, starting at Exit 32 (Sandy Point), with three lanes currently open. Westbound traffic is experiencing a 1.5-mile backup starting at Exit 38A (Duke Street) with two lanes open.

    Listen to BaySpan
  42. 1:57 PMTraffic advisory

    As of 2:06 p.m. on Friday, May 8th, traffic is delayed in both directions at the Bay Bridge.

    Eastbound traffic is backed up for one mile, starting at Exit 32 (Sandy Point), with three lanes currently open. Westbound traffic is experiencing a 1.5-mile backup starting at Exit 38A (Duke Street) with two lanes open.

    Listen to BaySpan
  43. 1:42 PMTraffic advisory

    Both directions of the Bay Bridge are currently experiencing traffic delays. As of 1:51 p.m., eastbound traffic is backed up for one mile starting at Exit 32 (Sandy Point) with three lanes operating. Westbound traffic is delayed for 1.5 miles starting at Exit 38a (Duke Street) with two lanes operating.

    Listen to BaySpan
  44. 1:32 PMTraffic advisory

    Westbound traffic is currently experiencing a 1.5-mile delay beginning at Exit 38A (Duke Street). Eastbound travel remains clear with no reported delays. The bridge is currently configured with three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  45. 1:17 PMTraffic advisory

    As of 1:26 p.m. on Friday, May 8th, eastbound traffic is experiencing delays starting at Exit 29a (Bush Frontage Road), roughly 3.5 miles from the bridge. Westbound traffic is currently moving freely with no delays. There are three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  46. 1:02 PMTraffic advisory

    As of 1:11 PM on Friday, May 8th, eastbound traffic is experiencing a 3.5-mile delay beginning at Exit 29a (Bush Frontage Road). Westbound traffic is currently clear with no delays. There are three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  47. 1:02 PMTraffic advisory

    As of 1:11 PM on Friday, May 8th, eastbound traffic is experiencing a 3.5-mile delay beginning at Exit 29a (Bush Frontage Road). Westbound traffic is currently clear with no delays. There are three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  48. 12:47 PMTraffic advisory

    As of 12:56 p.m. on Friday, May 8, eastbound traffic is experiencing a 3.5-mile delay starting at Exit 29A (Bush Frontage Road). Westbound traffic is currently clear with no delays. There are three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  49. 12:32 PMTraffic advisory

    As of Friday at 12:41 p.m., eastbound traffic is experiencing a 3.5-mile backup starting at Exit 29a (Bush Frontage Road). Westbound travel remains clear with no reported delays. The bridge is currently operating with three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  50. 12:17 PMTraffic advisory

    Eastbound traffic is currently experiencing a 3.5-mile delay starting at Exit 29a (Bush Frontage Road). Westbound traffic remains clear with no reported delays. The bridge is currently operating with three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  51. 12:02 PMTraffic advisory

    As of Friday, May 8th at 12:11 PM, eastbound traffic is experiencing a 3.5-mile delay starting at Exit 29a (Bush Frontage Road). Westbound traffic is currently clear with no delays. The bridge is operating with three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  52. 11:52 AMTraffic advisory

    Eastbound traffic is currently experiencing a 3.5-mile delay starting at Exit 29a (Bush Frontage Road). Westbound travel remains clear with no reported delays. There are currently three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  53. 11:52 AMTraffic advisory

    Eastbound traffic is currently experiencing a 3.5-mile delay starting at Exit 29a (Bush Frontage Road). Westbound travel remains clear with no reported delays. There are currently three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  54. 11:37 AMTraffic advisory

    Eastbound traffic is currently experiencing a 3.5-mile delay starting at Exit 29a (Bush Frontage Road). Westbound travel remains clear with no reported delays. The bridge is operating with three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  55. 11:22 AMTraffic advisory

    Eastbound traffic is currently experiencing delays starting at Exit 29a (Bush Frontage Road), roughly 3.5 miles from the bridge. Westbound traffic is currently clear with normal travel times. There are three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  56. 10:22 AMAll clear

    As of 10:31 a.m. on Friday, May 8th, there are currently no backups approaching the Bay Bridge in either direction, and traffic is moving at normal speeds.

    For the remainder of the weekend, the best times to travel are:

    • Friday: Before 10 a.m. and after 10 p.m.
    • Saturday: Before 7 a.m. and after 5 p.m.
    • Sunday: Before 10 a.m. and after 10 p.m.
    Listen to BaySpan
  57. 10:22 AMAll clear

    As of 10:31 a.m. on Friday, May 8th, there are currently no backups approaching the Bay Bridge in either direction, and traffic is moving at normal speeds.

    For the remainder of the weekend, the best times to travel are:

    • Friday: Before 10 a.m. and after 10 p.m.
    • Saturday: Before 7 a.m. and after 5 p.m.
    • Sunday: Before 10 a.m. and after 10 p.m.
    Listen to BaySpan
  58. 9:22 AMAll clear

    As of 9:31 a.m. on Friday, May 8th, there are no backups approaching the Bay Bridge in either direction, and traffic is moving at normal speeds. For those traveling throughout the weekend, the best times to cross are Friday before 10 a.m. and after 10 p.m., Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.

    Listen to BaySpan
  59. 9:22 AMAll clear

    As of 9:31 a.m. on Friday, May 8th, there are no backups approaching the Bay Bridge in either direction, and traffic is moving at normal speeds. For those traveling throughout the weekend, the best times to cross are Friday before 10 a.m. and after 10 p.m., Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.

    Listen to BaySpan
  60. 8:22 AMAll clear

    There are currently no backups approaching the Bay Bridge in either direction, and traffic flow remains normal. For those traveling this weekend, the best times to head out are Friday before 10 a.m. or after 10 p.m., Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

    Listen to BaySpan
  61. 8:22 AMAll clear

    There are currently no backups approaching the Bay Bridge in either direction, and traffic flow remains normal. For those traveling this weekend, the best times to head out are Friday before 10 a.m. or after 10 p.m., Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

    Listen to BaySpan
  62. 7:27 AMAll clear

    As of 7:36 a.m. on Friday, May 8th, there are currently no backups on or approaching the Bay Bridge in either direction, with traffic moving at normal speeds.

    For the remainder of the weekend, the best times to travel are:

    • Friday: Before 10 a.m. and after 10 p.m.
    • Saturday: Before 7 a.m. and after 5 p.m.
    • Sunday: Before 10 a.m. and after 10 p.m.
    Listen to BaySpan
  63. 7:27 AMAll clear

    As of 7:36 a.m. on Friday, May 8th, there are currently no backups on or approaching the Bay Bridge in either direction, with traffic moving at normal speeds.

    For the remainder of the weekend, the best times to travel are:

    • Friday: Before 10 a.m. and after 10 p.m.
    • Saturday: Before 7 a.m. and after 5 p.m.
    • Sunday: Before 10 a.m. and after 10 p.m.
    Listen to BaySpan
  64. 6:32 AMAll clear

    As of 6:41 a.m. on Friday, May 8th, there are no backups currently approaching the Bay Bridge in either direction, and travel times remain normal.

    If you are traveling this weekend, the best times to avoid congestion are:

    • Friday: Before 10 a.m. and after 10 p.m.
    • Saturday: Before 7 a.m. and after 5 p.m.
    • Sunday: Before 10 a.m. and after 10 p.m.
    Listen to BaySpan
  65. 6:32 AMAll clear

    As of 6:41 a.m. on Friday, May 8th, there are no backups currently approaching the Bay Bridge in either direction, and travel times remain normal.

    If you are traveling this weekend, the best times to avoid congestion are:

    • Friday: Before 10 a.m. and after 10 p.m.
    • Saturday: Before 7 a.m. and after 5 p.m.
    • Sunday: Before 10 a.m. and after 10 p.m.
    Listen to BaySpan
  66. 5:32 AMAll clear

    As of 5:41 a.m. on Friday, May 8th, there are no backups approaching the Bay Bridge in either direction, and traffic is moving at normal speeds. To avoid potential delays throughout the weekend, the best times to travel are before 10 a.m. and after 10 p.m. on Friday and Sunday, and before 7 a.m. or after 5 p.m. on Saturday.

    Listen to BaySpan
  67. 4:32 AMAll clear

    There are currently no backups on the approaches to the Bay Bridge in either direction, and travel times remain normal as of Friday morning.

    If you are planning to travel later this weekend, the best times to head out are before 10 a.m. or after 10 p.m. on both Friday and Sunday. For Saturday travel, aim to be on the road before 7 a.m. or after 5 p.m. to avoid the heaviest volume.

    Listen to BaySpan
  68. 3:32 AMAll clear

    There are currently no backups approaching the Bay Bridge in either direction. For those traveling this weekend, the best times to cross are Friday before 10 a.m. and after 10 p.m., Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.

    Listen to BaySpan
  69. 3:17 AMIssue reported

    As of 3:26 a.m. on Friday, May 8, traffic is flowing normally with no backups or delays in either direction on the Bay Bridge. While the left lane is currently closed westbound to discontinue two-way traffic, overall travel remains clear.

    Listen to BaySpan
  70. 3:17 AMIssue reported

    As of 3:26 a.m. on Friday, May 8, traffic is flowing normally with no backups or delays in either direction on the Bay Bridge. While the left lane is currently closed westbound to discontinue two-way traffic, overall travel remains clear.

    Listen to BaySpan
  71. 3:02 AMIssue reported

    As of Friday, May 8 at 3:11 PM, there are no backups or delays on the Bay Bridge in either direction. Both eastbound and westbound traffic are moving at normal speeds. On the bridge itself, the two left lanes are closed for the discontinuation of two-way traffic.

    Listen to BaySpan
  72. 2:47 AMConstruction

    As of 2:56 a.m. on Friday, May 8th, traffic is clear with no backups or delays on or approaching the Bay Bridge. Travel times are currently normal in both directions. The eastbound bridge is closed for road work, and the center lane of the westbound bridge is closed for a buffer, resulting in one lane of travel open for each direction.

    Listen to BaySpan
  73. 2:32 AMConstruction

    As of 2:41 a.m. on Friday, May 8, there are no backups or delays on or approaching the bridge, and traffic flow remains normal. The eastbound bridge is closed for roadwork, resulting in one lane open eastbound and one lane open westbound. The center lane on the westbound bridge is also closed to serve as a buffer.

    Listen to BaySpan
  74. 2:02 AMConstruction

    As of 2:11 a.m. on Friday, May 8th, there are no backups or delays on or approaching the Bay Bridge, and travel times are currently normal. The eastbound bridge is closed for roadwork, so traffic is restricted to one lane in each direction on the westbound bridge. Additionally, the center lane on the westbound bridge is closed to serve as a buffer.

    Listen to BaySpan
  75. 1:47 AMConstruction

    As of 1:56 a.m. on Friday, May 8th, there are no backups or delays on or approaching the Bay Bridge, and traffic is moving at normal speeds. Due to road work, the eastbound bridge is closed. Traffic is currently restricted to one lane eastbound and one lane westbound on the westbound bridge, with the center lane closed as a buffer.

    Listen to BaySpan
  76. 1:32 AMConstruction

    There are currently no backups or delays on or approaching the Bay Bridge. Traffic flow is normal in both directions. The eastbound bridge is closed for road work, and traffic is being diverted to the westbound bridge. As a result, the bridge is operating with one lane open for eastbound travel and one lane open for westbound travel. The center lane on the westbound bridge is closed to serve as a buffer.

    Listen to BaySpan
  77. 1:17 AMConstruction

    As of 1:26 a.m. on Friday, May 8th, there are no backups or delays on or approaching the Bay Bridge, and traffic is moving at normal speeds. The eastbound bridge is closed for roadwork, and the center lane of the westbound bridge is closed for a buffer. Currently, traffic is being shifted to two-way operations with one lane open in each direction.

    Listen to BaySpan
  78. 1:02 AMConstruction

    As of 1:11 a.m. on Friday, May 8th, there are no backups or delays on or approaching the Bay Bridge, and travel times remain normal. The eastbound bridge is currently closed for road work, and the center lane of the westbound bridge is closed for a buffer. Traffic is flowing via one lane eastbound and one lane westbound, with all motorists sharing the westbound bridge.

    Listen to BaySpan
  79. 1:02 AMConstruction

    As of 1:11 a.m. on Friday, May 8th, there are no backups or delays on or approaching the Bay Bridge, and travel times remain normal. The eastbound bridge is currently closed for road work, and the center lane of the westbound bridge is closed for a buffer. Traffic is flowing via one lane eastbound and one lane westbound, with all motorists sharing the westbound bridge.

    Listen to BaySpan
  80. 12:47 AMConstruction

    There are currently no backups or delays on or approaching the Bay Bridge. Traffic is flowing at normal speeds. The eastbound bridge is closed for road work, and the center lane of the westbound bridge is closed as a buffer. Consequently, the bridge is operating with only one lane open in each direction.

    Listen to BaySpan
  81. 12:32 AMConstruction

    Traffic is currently clear with no backups or delays on or approaching the bridge, and travel times are normal in both directions. Due to roadwork, the eastbound bridge is closed. All traffic is being diverted to the westbound bridge, which is currently operating with one lane open for each direction. The center lane of the westbound bridge remains closed as a buffer.

    Listen to BaySpan
  82. 12:32 AMConstruction

    Traffic is currently clear with no backups or delays on or approaching the bridge, and travel times are normal in both directions. Due to roadwork, the eastbound bridge is closed. All traffic is being diverted to the westbound bridge, which is currently operating with one lane open for each direction. The center lane of the westbound bridge remains closed as a buffer.

    Listen to BaySpan
  83. 12:17 AMConstruction

    There are currently no backups or delays on or approaching the Bay Bridge. As of 12:26 a.m. on Friday, May 8, traffic is restricted to one lane eastbound and one lane westbound. The eastbound bridge is closed for road work, and the center lane on the westbound bridge is closed for a buffer.

    Listen to BaySpan
  84. 12:02 AMConstruction

    As of 12:11 a.m. on Friday, May 8th, traffic is flowing normally with no backups or delays. The eastbound bridge is closed for road work, and the center lane of the westbound bridge is closed for a buffer. This has restricted travel to one lane eastbound and one lane westbound.

    Listen to BaySpan