Skip to content

Maryland · Chesapeake Bay Bridge · Archive

Bay Bridge status history

Revisit a day on the bridge. Browse saved closures, traffic advisories, daily recaps, BaySpan recordings, and camera photos and videos from notable updates. All dates and times are Eastern.

Check current bridge conditions →

Wednesday, March 11, 2026

Jump to today

76 updates logged

  1. 10:23 PMAll clear

    Traffic is currently clear with no backups approaching the Bay Bridge in either direction. For those planning trips over the weekend, the best times to travel are Friday before 10 a.m. and after 10 p.m., Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.

    Listen to BaySpan
  2. 9:28 PMAll clear

    There are currently no backups approaching the Bay Bridge in either direction, and traffic is moving normally. For those planning trips this weekend, the best times to travel are Friday before 10 a.m. and after 10 p.m., Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.

    Listen to BaySpan
  3. 9:28 PMAll clear

    There are currently no backups approaching the Bay Bridge in either direction, and traffic is moving normally. For those planning trips this weekend, the best times to travel are Friday before 10 a.m. and after 10 p.m., Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.

    Listen to BaySpan
  4. 8:28 PMAll clear

    Traffic is currently clear with no backups in either direction and travel times remain normal. For those planning trips over the upcoming weekend, the best times to travel are Friday before 10 a.m. or after 10 p.m., Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

    Listen to BaySpan
  5. 7:28 PMAll clear

    There are currently no backups approaching the Bay Bridge in either direction, and traffic is moving at normal travel speeds. For those planning a trip over the weekend, the best times to travel are Friday before 10 a.m. and after 10 p.m., Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.

    Listen to BaySpan
  6. 7:13 PMIssue reported

    There are currently no backups or delays in either direction on the Bay Bridge. As of 7:21 p.m. on Wednesday, March 11th, traffic is flowing normally both eastbound and westbound. While the westbound left lane is closed to transition away from two-way traffic operations, it is not currently impacting travel times.

    Listen to BaySpan
  7. 6:13 PMAll clear

    As of 6:21 p.m. on Wednesday, March 11th, there are no delays in either direction at the bridge. Traffic is currently flowing at normal speeds with three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  8. 6:13 PMAll clear

    As of 6:21 p.m. on Wednesday, March 11th, there are no delays in either direction at the bridge. Traffic is currently flowing at normal speeds with three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  9. 6:13 PMAll clear

    As of 6:21 p.m. on Wednesday, March 11th, there are no delays in either direction at the bridge. Traffic is currently flowing at normal speeds with three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  10. 4:13 PMAll clear

    Traffic is currently clear with no delays in either direction. As of Wednesday afternoon, there are three lanes operating eastbound and two lanes operating westbound, with travel times remaining at normal levels.

    Listen to BaySpan
  11. 4:12 PMAll clear

    Traffic is currently clear with no delays in either direction. As of Wednesday afternoon, there are three lanes operating eastbound and two lanes operating westbound, with travel times remaining at normal levels.

    Listen to BaySpan
  12. 3:12 PMAll clear

    Traffic is currently clear with no delays in either direction. As of Wednesday, March 11th at 3:21 p.m., the bridge is operating with three lanes open eastbound and two lanes open westbound.

    Listen to BaySpan
  13. 2:58 PMConstruction

    As of Wednesday, March 11th, at 3:06 p.m., there are no backups or delays in either direction on the Bay Bridge. Traffic is flowing normally both eastbound and westbound, though the left lane on the bridge is currently closed to prepare for two-way traffic.

    Listen to BaySpan
  14. 2:58 PMConstruction

    As of Wednesday, March 11th, at 3:06 p.m., there are no backups or delays in either direction on the Bay Bridge. Traffic is flowing normally both eastbound and westbound, though the left lane on the bridge is currently closed to prepare for two-way traffic.

    Listen to BaySpan
  15. 2:43 PMConstruction

    As of 2:51 PM on Wednesday, March 11th, there are no backups or delays on or approaching the bridge in either direction. Both eastbound and westbound traffic are moving at normal speeds. The left lane is currently closed to prepare for two-way traffic, but this is not causing any current travel disruptions.

    Listen to BaySpan
  16. 2:43 PMConstruction

    As of 2:51 PM on Wednesday, March 11th, there are no backups or delays on or approaching the bridge in either direction. Both eastbound and westbound traffic are moving at normal speeds. The left lane is currently closed to prepare for two-way traffic, but this is not causing any current travel disruptions.

    Listen to BaySpan
  17. 1:48 PMAll clear

    Traffic is currently clear with no backups approaching the Bay Bridge in either direction. For those planning travel this weekend, the best times to cross are Friday before 10 a.m. and after 10 p.m., Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.

    Listen to BaySpan
  18. 1:33 PMConstruction

    As of Wednesday afternoon, traffic is flowing normally with no delays or backups in either direction on the Bay Bridge. While the right lane of the westbound bridge is currently closed for maintenance, travel times remain standard for both eastbound and westbound motorists.

    Listen to BaySpan
  19. 1:33 PMConstruction

    As of Wednesday afternoon, traffic is flowing normally with no delays or backups in either direction on the Bay Bridge. While the right lane of the westbound bridge is currently closed for maintenance, travel times remain standard for both eastbound and westbound motorists.

    Listen to BaySpan
  20. 1:18 PMConstruction

    Traffic is currently clear in both directions with no backups or delays reported as of Wednesday afternoon. While the right lane on the bridge is closed for roadwork, travel remains normal for both eastbound and westbound motorists.

    Listen to BaySpan
  21. 1:03 PMConstruction

    As of Wednesday afternoon, there are no backups or delays approaching or crossing the Bay Bridge in either direction. While traffic flow remains normal, the right lane on the bridge is currently closed for road work.

    Listen to BaySpan
  22. 12:48 PMConstruction

    Traffic is currently clear with no backups or delays in either direction. As of 12:56 p.m. on Wednesday, March 11th, motorists are experiencing normal travel conditions. While traffic is moving smoothly, the right lane on the westbound bridge is closed for ongoing roadwork.

    Listen to BaySpan
  23. 12:48 PMConstruction

    Traffic is currently clear with no backups or delays in either direction. As of 12:56 p.m. on Wednesday, March 11th, motorists are experiencing normal travel conditions. While traffic is moving smoothly, the right lane on the westbound bridge is closed for ongoing roadwork.

    Listen to BaySpan
  24. 12:33 PMConstruction

    There are currently no backups or delays in either direction at the Bay Bridge as of Wednesday at 12:41 p.m. While roadwork has required the closure of the westbound right lane, traffic flow remains normal and unaffected.

    Listen to BaySpan
  25. 12:33 PMConstruction

    There are currently no backups or delays in either direction at the Bay Bridge as of Wednesday at 12:41 p.m. While roadwork has required the closure of the westbound right lane, traffic flow remains normal and unaffected.

    Listen to BaySpan
  26. 12:23 PMConstruction

    As of Wednesday, March 11th at 12:31 p.m., there are no backups or delays in either direction. Traffic is moving at normal speeds, though the right lane on the westbound bridge is currently closed for road work.

    Listen to BaySpan
  27. 12:23 PMConstruction

    As of Wednesday, March 11th at 12:31 p.m., there are no backups or delays in either direction. Traffic is moving at normal speeds, though the right lane on the westbound bridge is currently closed for road work.

    Listen to BaySpan
  28. 12:13 PMConstruction

    As of Wednesday, March 11th at 12:21 p.m., there are no backups or delays in either direction at the Bay Bridge. Both eastbound and westbound traffic are moving at normal speeds. Notably, westbound traffic is experiencing no delays despite the right lane on the bridge being closed for road work.

    Listen to BaySpan
  29. 11:58 AMConstruction

    As of Wednesday at 12:06 p.m., traffic is moving normally with no backups or delays in either direction on the Bay Bridge. While the right lane is closed for roadwork on the westbound bridge, it is not currently impacting travel times.

    Listen to BaySpan
  30. 11:33 AMConstruction

    As of 11:41 a.m. on Wednesday, March 11th, traffic is flowing normally with no backups or delays in either direction on the Bay Bridge. While the westbound right lane is currently closed for roadwork, it is not impacting travel times.

    Listen to BaySpan
  31. 11:18 AMConstruction

    No backups are reported on or approaching the Bay Bridge in either direction. Traffic is currently flowing normally for both eastbound and westbound travelers, despite a right lane closure on the bridge for road work.

    Listen to BaySpan
  32. 11:03 AMConstruction

    Traffic on the Bay Bridge is currently clear with no backups or delays in either direction as of Wednesday, March 11th, at 11:11 AM. While the right lane on the bridge is closed for road work, travel remains normal for both eastbound and westbound motorists.

    Listen to BaySpan
  33. 10:48 AMConstruction

    Traffic is currently clear with no backups approaching or on the Bay Bridge in either direction. As of 10:56 a.m. on Wednesday, March 11th, travel is moving at normal speeds for both eastbound and westbound commuters. Although the right lane on the bridge is closed for maintenance work, it is not currently causing any delays for westbound traffic.

    Listen to BaySpan
  34. 10:33 AMConstruction

    Traffic is currently clear with no backups or delays in either direction as of Wednesday, March 11th at 10:41 a.m. Although the right lane is closed for road work, travel times remain normal for both eastbound and westbound motorists.

    Listen to BaySpan
  35. 10:33 AMConstruction

    Traffic is currently clear with no backups or delays in either direction as of Wednesday, March 11th at 10:41 a.m. Although the right lane is closed for road work, travel times remain normal for both eastbound and westbound motorists.

    Listen to BaySpan
  36. 10:23 AMConstruction

    Traffic is currently clear on the Bay Bridge with no backups or delays in either direction. As of Wednesday morning, travel times remain normal for both eastbound and westbound motorists. Although the right lane is closed for roadwork, it is not impacting the flow of traffic. Maintain a safe following distance from the vehicle in front of you to avoid rear-end collisions.

    Listen to BaySpan
  37. 10:13 AMConstruction

    As of 10:21 a.m. on Wednesday, March 11th, traffic is moving normally with no backups or delays in either direction. While the right lane is currently closed for road work on the westbound bridge, travel times remain unaffected. Eastbound lanes are also completely clear.

    Listen to BaySpan
  38. 9:58 AMConstruction

    As of 10:06 a.m. on Wednesday, March 11th, there are currently no backups or delays in either direction on the Bay Bridge. While the right lane on the westbound span is closed for roadwork, traffic flow remains normal for both eastbound and westbound travelers.

    Listen to BaySpan
  39. 9:48 AMConstruction

    As of 9:56 a.m. on Wednesday, March 11th, there are no backups or delays on the Bay Bridge in either direction. Both eastbound and westbound traffic are moving at normal speeds. Drivers should be aware that the right lane on the westbound bridge is currently closed for road work, though it is not impacting travel times.

    Listen to BaySpan
  40. 9:33 AMConstruction

    As of Wednesday, March 11th at 9:41 a.m., there are no backups or delays on or approaching the Bay Bridge in either direction. While the right lane is closed for roadwork on the westbound bridge, traffic is currently flowing normally.

    Listen to BaySpan
  41. 9:33 AMConstruction

    As of Wednesday, March 11th at 9:41 a.m., there are no backups or delays on or approaching the Bay Bridge in either direction. While the right lane is closed for roadwork on the westbound bridge, traffic is currently flowing normally.

    Listen to BaySpan
  42. 8:33 AMAll clear

    Traffic is currently clear with no backups approaching the bridge in either direction. If you are traveling this weekend, the best times to avoid congestion are Friday before 10 a.m. and after 10 p.m., Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.

    Listen to BaySpan
  43. 8:33 AMAll clear

    Traffic is currently clear with no backups approaching the bridge in either direction. If you are traveling this weekend, the best times to avoid congestion are Friday before 10 a.m. and after 10 p.m., Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.

    Listen to BaySpan
  44. 7:33 AMAll clear

    There are currently no backups approaching the Bay Bridge in either direction, with traffic moving at normal speeds. For those traveling this upcoming weekend, the best times to avoid congestion are Friday before 10 a.m. and after 10 p.m., Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.

    Listen to BaySpan
  45. 6:33 AMAll clear

    As of Wednesday morning at 6:41 a.m., traffic is currently clear with no backups approaching the Bay Bridge in either direction.

    If you are planning to travel later this weekend, the best times to avoid delays are Friday before 10 a.m. or after 10 p.m., Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

    Listen to BaySpan
  46. 5:33 AMAll clear

    As of 5:41 a.m. on Wednesday, March 11th, there are no backups approaching the Bay Bridge in either direction, and traffic flow is normal.

    If you are traveling this weekend, the best times to cross are Friday and Sunday before 10 a.m. or after 10 p.m. For Saturday travel, plan to be on the bridge before 7 a.m. or after 5 p.m. to avoid potential delays.

    Listen to BaySpan
  47. 5:33 AMAll clear

    As of 5:41 a.m. on Wednesday, March 11th, there are no backups approaching the Bay Bridge in either direction, and traffic flow is normal.

    If you are traveling this weekend, the best times to cross are Friday and Sunday before 10 a.m. or after 10 p.m. For Saturday travel, plan to be on the bridge before 7 a.m. or after 5 p.m. to avoid potential delays.

    Listen to BaySpan
  48. 4:33 AMAll clear

    Traffic is currently clear with no backups in either direction, and travel times remain normal for this time of day.

    For those planning trips over the upcoming weekend, the best times to travel are:

    • Friday: Before 10 a.m. and after 10 p.m.
    • Saturday: Before 7 a.m. and after 5 p.m.
    • Sunday: Before 10 a.m. and after 10 p.m.
    Listen to BaySpan
  49. 4:18 AMIssue reported

    Traffic is currently clear with no backups or delays in either direction as of Wednesday at 4:26 a.m. Both eastbound and westbound travel times are normal. The westbound left lane is closed to discontinue two-way traffic.

    Listen to BaySpan
  50. 4:18 AMIssue reported

    Traffic is currently clear with no backups or delays in either direction as of Wednesday at 4:26 a.m. Both eastbound and westbound travel times are normal. The westbound left lane is closed to discontinue two-way traffic.

    Listen to BaySpan
  51. 4:03 AMConstruction

    Traffic is moving normally with no backups or delays on or approaching the bridge. Current operations include one lane westbound and three lanes eastbound, with the westbound center lane closed to serve as a buffer.

    Listen to BaySpan
  52. 3:48 AMConstruction

    As of 3:56 a.m. on Wednesday, March 11, there are no backups or delays on or approaching the Bay Bridge, and traffic flow remains normal. The eastbound bridge is closed for road work, and traffic is being diverted to the westbound bridge. Current operations are limited to one lane in each direction, with the center lane on the westbound bridge closed as a buffer.

    Listen to BaySpan
  53. 3:33 AMConstruction

    Current traffic is clear with no backups or delays as of 3:41 a.m. on Wednesday, March 11th. While travel times remain normal, the eastbound bridge is closed for roadwork. Traffic is currently restricted to one lane in each direction on the westbound bridge, with the center lane closed to serve as a buffer.

    Listen to BaySpan
  54. 3:33 AMConstruction

    Current traffic is clear with no backups or delays as of 3:41 a.m. on Wednesday, March 11th. While travel times remain normal, the eastbound bridge is closed for roadwork. Traffic is currently restricted to one lane in each direction on the westbound bridge, with the center lane closed to serve as a buffer.

    Listen to BaySpan
  55. 3:18 AMConstruction

    Traffic is currently clear with no backups or delays as of 3:26 a.m. on Wednesday, March 11th. The eastbound bridge is closed for maintenance, resulting in one lane of traffic moving in each direction on the westbound bridge. The center lane of the westbound bridge is closed to serve as a buffer.

    Listen to BaySpan
  56. 3:03 AMConstruction

    As of Wednesday afternoon, there are no backups or delays on or approaching the bridge, and traffic is moving at normal speeds. The eastbound bridge is closed for road work, so traffic is currently reduced to one lane eastbound and one lane westbound on the westbound span. Additionally, the center lane on the westbound bridge is closed to serve as a buffer.

    Listen to BaySpan
  57. 3:03 AMConstruction

    Traffic is moving at normal speeds with no backups or delays reported as of Wednesday, March 11th, at 3:11 PM. The eastbound bridge is closed for road work. Current operations are restricted to one lane eastbound and one lane westbound on the westbound span, with the center lane closed as a buffer.

    Listen to BaySpan
  58. 2:48 AMConstruction

    There are no backups or delays on or approaching the Bay Bridge, and traffic is currently flowing at normal speeds. The eastbound bridge is closed for road work, and all traffic is shifted to the westbound bridge. Two-way travel is in effect with one lane open eastbound and one lane open westbound, while the center lane remains closed as a buffer.

    Listen to BaySpan
  59. 2:38 AMConstruction

    As of Wednesday at 2:46 a.m., traffic is moving normally with no backups or delays on or approaching the bridge. The eastbound bridge is currently closed for road work, resulting in a two-way traffic configuration on the westbound bridge with one lane open in each direction. Additionally, the center lane on the westbound bridge is closed to serve as a buffer.

    Listen to BaySpan
  60. 2:38 AMConstruction

    As of Wednesday at 2:46 a.m., traffic is moving normally with no backups or delays on or approaching the bridge. The eastbound bridge is currently closed for road work, resulting in a two-way traffic configuration on the westbound bridge with one lane open in each direction. Additionally, the center lane on the westbound bridge is closed to serve as a buffer.

    Listen to BaySpan
  61. 2:23 AMConstruction

    Traffic is currently clear with no backups or delays in either direction. The eastbound bridge is closed for road work, and all traffic is shifted to the westbound bridge, which is operating with one lane open for each direction. Additionally, the center lane on the westbound bridge is closed to serve as a buffer.

    Listen to BaySpan
  62. 2:18 AMBridge closed

    As of 2:26 a.m. on Wednesday, March 11th, there are no backups or delays on or approaching the bridge, and travel times remain normal in both directions. The eastbound bridge is closed for road work, and the center lane of the westbound bridge is closed for a buffer. Traffic is currently restricted to one lane eastbound and one lane westbound.

    Listen to BaySpan
  63. 2:03 AMConstruction

    Traffic is currently clear with no backups or delays. As of 2:11 a.m. on Wednesday, March 11th, travel times remain normal in both directions. The eastbound bridge is closed for road work, resulting in a two-way traffic configuration on the westbound bridge with one lane open for each direction. Additionally, the center lane on the westbound bridge is closed to serve as a buffer.

    Listen to BaySpan
  64. 1:53 AMConstruction

    There are no backups or delays currently on or approaching the Bay Bridge. As of 2:01 a.m. on Wednesday, March 11th, traffic is moving at normal speeds. The eastbound bridge is closed for road work, and traffic is operating via two-way operations on the westbound bridge with one lane open in each direction. The center lane on the westbound bridge is closed to serve as a buffer lane.

    Listen to BaySpan
  65. 1:38 AMConstruction

    Traffic is currently clear with no backups or delays. As of 1:46 a.m. Wednesday, the eastbound bridge is closed for road work. All traffic is being shifted to the westbound bridge, which is operating with one lane in each direction and a closed center buffer lane. Travel times remain normal for this time of day.

    Listen to BaySpan
  66. 1:28 AMConstruction

    As of Wednesday, March 11th at 1:36 a.m., traffic is moving normally with no backups or delays on or approaching the Bay Bridge. The eastbound bridge is currently closed for roadwork, meaning all traffic is diverted to the westbound bridge. This configuration provides one lane for eastbound travel and one lane for westbound travel. Additionally, the center lane on the westbound bridge is closed to act as a buffer.

    Listen to BaySpan
  67. 1:13 AMConstruction

    Traffic is currently clear with no backups or delays at the Bay Bridge as of 1:21 a.m. Wednesday, March 11th. Road work has closed the eastbound bridge, resulting in two-way traffic on the westbound bridge with one lane open in each direction. The center lane on the westbound bridge is closed as a buffer, and travel times remain normal for both eastbound and westbound motorists.

    Listen to BaySpan
  68. 1:03 AMConstruction

    As of 1:11 a.m. on Wednesday, March 11th, there are no backups or delays on or approaching the Bay Bridge, and traffic flow is normal. The eastbound bridge is closed for road work, and the center lane on the westbound bridge is closed. Currently, traffic is restricted to one lane eastbound and one lane westbound.

    Listen to BaySpan
  69. 12:58 AMBridge closed

    Traffic is currently clear with no backups or delays. The eastbound bridge is closed for road work, with traffic diverted to the westbound bridge. Currently, there is one lane open in each direction, and the center lane on the westbound bridge is closed as a buffer. Travel times remain normal.

    Listen to BaySpan
  70. 12:58 AMBridge closed

    Traffic is currently clear with no backups or delays. The eastbound bridge is closed for road work, with traffic diverted to the westbound bridge. Currently, there is one lane open in each direction, and the center lane on the westbound bridge is closed as a buffer. Travel times remain normal.

    Listen to BaySpan
  71. 12:48 AMConstruction

    Traffic is currently clear with no backups or delays reported in either direction. Travel times are normal, though the eastbound bridge is closed for road work. All traffic is being diverted to the westbound bridge, which is currently operating with one lane open for eastbound travel and one lane open for westbound travel. The center lane on the westbound bridge is also closed to serve as a buffer.

    Listen to BaySpan
  72. 12:48 AMConstruction

    Traffic is currently clear with no backups or delays reported in either direction. Travel times are normal, though the eastbound bridge is closed for road work. All traffic is being diverted to the westbound bridge, which is currently operating with one lane open for eastbound travel and one lane open for westbound travel. The center lane on the westbound bridge is also closed to serve as a buffer.

    Listen to BaySpan
  73. 12:33 AMConstruction

    There are no backups or delays on or approaching the bridge, and traffic is currently flowing at normal speeds in both directions. The eastbound bridge is closed for road work, so all traffic is diverted to the westbound bridge. This bridge is operating with two-way traffic: one lane is open eastbound and one lane is open westbound, with the center lane closed as a buffer.

    Listen to BaySpan
  74. 12:18 AMConstruction

    Traffic is currently moving normally with no backups or delays. The eastbound bridge is closed for road work, with traffic diverted to the westbound bridge. Travel is restricted to one lane in each direction, and the center lane of the westbound bridge is closed as a buffer. Even with these lane configurations, travel times remain typical for both eastbound and westbound motorists.

    Listen to BaySpan
  75. 12:03 AMConstruction

    There are no backups or delays at the Bay Bridge as of 12:11 a.m. Wednesday, March 11th. Traffic is moving at normal speeds, although the bridge is currently operating with only one lane in each direction. The eastbound span is closed for road work, and the center lane of the westbound span is closed as a buffer. All traffic is being directed across the westbound span.

    Listen to BaySpan
  76. 12:03 AMConstruction

    There are no backups or delays at the Bay Bridge as of 12:11 a.m. Wednesday, March 11th. Traffic is moving at normal speeds, although the bridge is currently operating with only one lane in each direction. The eastbound span is closed for road work, and the center lane of the westbound span is closed as a buffer. All traffic is being directed across the westbound span.

    Listen to BaySpan