  1. 11:58 PMConstruction

    As of 12:05 a.m. on Sunday, March 1st, there are no backups or delays on or approaching the Bay Bridge, and traffic is moving at normal speeds. The westbound bridge is closed for road work, with traffic currently operating in a two-way configuration of one lane eastbound and one lane westbound.

    Listen to BaySpan
  2. 11:58 PMConstruction

    As of 12:05 a.m. on Sunday, March 1st, there are no backups or delays on or approaching the Bay Bridge, and traffic is moving at normal speeds. The westbound bridge is closed for road work, with traffic currently operating in a two-way configuration of one lane eastbound and one lane westbound.

    Listen to BaySpan
  3. 11:43 PMConstruction

    Traffic is currently clear with normal travel times in both directions, but the westbound bridge is closed for road work. The bridge is operating under a two-way traffic pattern with only one lane open eastbound and one lane open westbound.

    Listen to BaySpan
  4. 11:28 PMConstruction

    There are no backups or delays currently on or approaching the Bay Bridge. The westbound bridge is closed for roadwork, and traffic is operating in a two-way configuration with one lane open in each direction.

    Listen to BaySpan
  5. 11:13 PMConstruction

    As of Saturday at 11:20 p.m., there are no backups or delays on or approaching the bridge. Traffic is flowing at normal durations in both directions. The westbound bridge is currently closed for road work, with traffic diverted to a two-way configuration consisting of one lane eastbound and one lane westbound on the active span.

    Listen to BaySpan
  6. 10:58 PMConstruction

    As of 11:05 p.m. on Saturday, February 28th, there are no backups or delays on or approaching the Bay Bridge, with traffic moving at normal speeds. The westbound bridge is closed for road work, and travel is currently restricted to one lane in each direction.

    Listen to BaySpan
  7. 10:43 PMConstruction

    As of 10:50 p.m. on Saturday, February 28th, there are no backups or delays on or approaching the Bay Bridge, with traffic moving at normal speeds. The westbound bridge is closed for road work, resulting in a two-way traffic configuration where only one lane is open in each direction.

    Listen to BaySpan
  8. 10:43 PMConstruction

    As of 10:50 p.m. on Saturday, February 28th, there are no backups or delays on or approaching the Bay Bridge, with traffic moving at normal speeds. The westbound bridge is closed for road work, resulting in a two-way traffic configuration where only one lane is open in each direction.

    Listen to BaySpan
  9. 10:28 PMConstruction

    As of 10:35 PM on Saturday, there are no backups or delays on or approaching the Bay Bridge. Traffic is moving at normal speeds. The westbound bridge is closed for road work, and travel is restricted to one lane in each direction.

    Listen to BaySpan
  10. 10:13 PMConstruction

    Traffic is moving normally with no backups or delays at the Bay Bridge. The westbound bridge is closed for road work, and traffic is currently limited to one lane in each direction.

    Listen to BaySpan
  11. 9:58 PMConstruction

    There are currently no backups or delays on or approaching the bridge. The westbound span is closed for road work, and traffic is operating in a two-way configuration with one lane open in each direction. Even with the closure, travel times are normal for both eastbound and westbound motorists.

    Listen to BaySpan
  12. 9:43 PMConstruction

    Traffic is currently moving normally with no backups or delays on or approaching the bridge. The westbound span is closed for roadwork, and traffic is being diverted into a two-way configuration with one lane open in each direction.

    Listen to BaySpan
  13. 9:28 PMConstruction

    As of 9:35 p.m. on Saturday, February 28th, there are no backups or delays currently affecting the bridge. While travel times remain normal, the westbound bridge is closed for road work. Traffic is being shifted to the eastbound bridge, which is operating with one lane open in each direction.

    Listen to BaySpan
  14. 9:13 PMConstruction

    There are currently no backups or delays on or approaching the Bay Bridge. Traffic is flowing at normal speeds with the westbound bridge closed for road work. Operations are currently limited to one lane in each direction.

    Listen to BaySpan
  15. 8:58 PMConstruction

    There are currently no backups or delays on or approaching the Bay Bridge. Traffic is moving at normal speeds in both directions. The westbound bridge is closed for road work, so travel is restricted to a two-way configuration with one lane open eastbound and one lane open westbound.

    Listen to BaySpan
  16. 8:43 PMConstruction

    As of 8:50 p.m. Saturday, February 28th, there are no backups or delays on or approaching the bridge. The westbound bridge is currently closed for road work, meaning traffic is limited to one lane in each direction.

    Listen to BaySpan
  17. 8:28 PMConstruction

    There are currently no backups or delays on or approaching the bridge. As of 8:35 p.m. on Saturday, February 28th, traffic is moving at normal speeds. The westbound bridge is closed for road work, and traffic is being maintained in a two-way configuration with one lane open in each direction.

    Listen to BaySpan
  18. 8:28 PMConstruction

    There are currently no backups or delays on or approaching the bridge. As of 8:35 p.m. on Saturday, February 28th, traffic is moving at normal speeds. The westbound bridge is closed for road work, and traffic is being maintained in a two-way configuration with one lane open in each direction.

    Listen to BaySpan
  19. 8:13 PMConstruction

    There are currently no backups on the Bay Bridge, and traffic is moving normally in both directions. Eastbound travel remains steady despite a left lane closure for two-way traffic preparation. Westbound traffic is also experiencing no delays, though the two right lanes are closed for road work.

    Listen to BaySpan
  20. 7:13 PMAll clear

    There are currently no backups on or approaching the bridge in either direction. For the remainder of the weekend, the best times to travel on Saturday are before 7 a.m. and after 5 p.m. On Sunday, plan to cross before 10 a.m. or after 10 p.m.

    Listen to BaySpan
  21. 7:13 PMAll clear

    There are currently no backups on or approaching the bridge in either direction. For the remainder of the weekend, the best times to travel on Saturday are before 7 a.m. and after 5 p.m. On Sunday, plan to cross before 10 a.m. or after 10 p.m.

    Listen to BaySpan
  22. 7:13 PMAll clear

    There are currently no backups on or approaching the bridge in either direction. For the remainder of the weekend, the best times to travel on Saturday are before 7 a.m. and after 5 p.m. On Sunday, plan to cross before 10 a.m. or after 10 p.m.

    Listen to BaySpan
  23. 6:13 PMAll clear

    Currently, there are no backups on or approaching the Bay Bridge in either direction, and traffic is flowing at normal speeds. For those traveling through the remainder of the weekend, the best times to be on the road are Saturday after 5:00 p.m. and Sunday before 10:00 a.m. or after 10:00 p.m.

    Listen to BaySpan
  24. 5:13 PMAll clear

    There are currently no backups approaching the Bay Bridge in either direction, and traffic is flowing at normal speeds. For those traveling through the remainder of the weekend, the best times to cross are Saturday after 5:00 p.m. and Sunday either before 10:00 a.m. or after 10:00 p.m.

    Listen to BaySpan
  25. 4:13 PMAll clear

    Traffic is currently normal in both directions as of Saturday at 4:20 PM. For the remainder of the weekend, the best times to travel are Saturday after 5:00 PM, and Sunday before 10:00 AM or after 10:00 PM.

    Listen to BaySpan
  26. 4:13 PMAll clear

    Traffic is currently normal in both directions as of Saturday at 4:20 PM. For the remainder of the weekend, the best times to travel are Saturday after 5:00 PM, and Sunday before 10:00 AM or after 10:00 PM.

    Listen to BaySpan
  27. 4:13 PMAll clear

    Traffic is currently normal with no delays reported in either direction. For the best travel conditions this weekend, plan to cross on Friday before 10 a.m. or after 10 p.m., Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

    Listen to BaySpan
  28. 3:13 PMAll clear

    As of Saturday, February 28th at 3:20 p.m., there are currently no backups approaching the Bay Bridge in either direction, and travel times remain normal. For the remainder of the weekend, the best times to travel on Saturday are before 7 a.m. and after 5 p.m., and on Sunday before 10 a.m. and after 10 p.m.

    Listen to BaySpan
  29. 2:13 PMAll clear

    As of 2:20 p.m. on Saturday, February 28, there are currently no backups approaching the Bay Bridge in either direction, and traffic is flowing at normal speeds. For those planning trips throughout the rest of the weekend, the best times to travel are Saturday after 5 p.m. and Sunday before 10 a.m. or after 10 p.m.

    Listen to BaySpan
  30. 1:13 PMAll clear

    As of 1:20 p.m. on Saturday, February 28th, there are currently no backups approaching the Bay Bridge in either direction, and travel times remain normal. For the remainder of the weekend, the best times to travel are today after 5:00 p.m., or on Sunday before 10 a.m. and after 10:00 p.m.

    Listen to BaySpan
  31. 1:13 PMAll clear

    As of 1:20 p.m. on Saturday, February 28th, there are currently no backups approaching the Bay Bridge in either direction, and travel times remain normal. For the remainder of the weekend, the best times to travel are today after 5:00 p.m., or on Sunday before 10 a.m. and after 10:00 p.m.

    Listen to BaySpan
  32. 12:13 PMAll clear

    Current traffic is clear with no backups approaching the bridge in either direction. For those planning trips throughout the weekend, the best times to travel on Saturday are before 7 a.m. and after 5 p.m. On Sunday, the lightest traffic is expected before 10 a.m. and after 10 p.m.

    Listen to BaySpan
  33. 12:13 PMAll clear

    Current traffic is clear with no backups approaching the bridge in either direction. For those planning trips throughout the weekend, the best times to travel on Saturday are before 7 a.m. and after 5 p.m. On Sunday, the lightest traffic is expected before 10 a.m. and after 10 p.m.

    Listen to BaySpan
  34. 11:13 AMAll clear

    There are currently no backups approaching the Bay Bridge in either direction. As of 11:20 a.m. on Saturday, February 28th, traffic is moving at normal speeds with travel times consistent with typical conditions.

    Listen to BaySpan
  35. 11:13 AMAll clear

    There are currently no backups approaching the Bay Bridge in either direction. As of 11:20 a.m. on Saturday, February 28th, traffic is moving at normal speeds with travel times consistent with typical conditions.

    Listen to BaySpan
  36. 10:13 AMAll clear

    As of 10:20 a.m. on Saturday, February 28th, traffic is flowing normally with no backups approaching the bridge in either direction.

    For those traveling throughout the remainder of the weekend, the best times to be on the road are Saturday after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

    Listen to BaySpan
  37. 9:13 AMAll clear

    There are currently no backups approaching the Bay Bridge in either direction. For the remainder of the weekend, the recommended times to travel are Saturday after 5:00 p.m. and Sunday before 10:00 a.m. or after 10:00 p.m.

    Listen to BaySpan
  38. 8:13 AMAll clear

    There are currently no backups approaching the Bay Bridge in either direction. Traffic flow is normal. For the remainder of the weekend, the best times to travel on Saturday are after 5 p.m. On Sunday, plan to cross before 10 a.m. or after 10 p.m. to avoid congestion.

    Listen to BaySpan
  39. 7:13 AMAll clear

    There are currently no backups approaching the Bay Bridge in either direction, and traffic is moving at normal speeds. For the remainder of the weekend, the best times to travel are Saturday after 5:00 p.m. and Sunday before 10:00 a.m. or after 10:00 p.m.

    Listen to BaySpan
  40. 7:13 AMAll clear

    There are currently no backups approaching the Bay Bridge in either direction, and traffic is moving at normal speeds. For the remainder of the weekend, the best times to travel are Saturday after 5:00 p.m. and Sunday before 10:00 a.m. or after 10:00 p.m.

    Listen to BaySpan
  41. 6:18 AMAll clear

    There are currently no backups approaching the Bay Bridge in either direction, and traffic is flowing at normal speeds. For the remainder of the weekend, the best times to travel on Saturday are before 7 a.m. and after 5 p.m. On Sunday, optimal travel windows are before 10 a.m. and after 10 p.m.

    Listen to BaySpan
  42. 5:23 AMAll clear

    As of 5:30 a.m. on Saturday, February 28th, traffic is moving normally with no backups approaching the Bay Bridge in either direction.

    For the remainder of the weekend, the best times to travel on Saturday are before 7 a.m. and after 5 p.m. On Sunday, optimal travel windows are before 10 a.m. and after 10 p.m.

    Listen to BaySpan
  43. 4:23 AMAll clear

    There are currently no backups on the approaches to the Bay Bridge in either direction, with travel times remaining normal. For the remainder of the weekend, the best times to travel are Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.

    Listen to BaySpan
  44. 4:23 AMAll clear

    There are currently no backups on the approaches to the Bay Bridge in either direction, with travel times remaining normal. For the remainder of the weekend, the best times to travel are Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.

    Listen to BaySpan
  45. 3:23 AMAll clear

    Traffic is currently clear with no backups in either direction. For the remainder of the weekend, the best times to travel are Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

    Listen to BaySpan
  46. 3:23 AMAll clear

    Traffic is currently clear with no backups in either direction. For the remainder of the weekend, the best times to travel are Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

    Listen to BaySpan
  47. 2:23 AMAll clear

    There are currently no backups approaching the Bay Bridge in either direction. Traffic flow is normal for early Saturday morning. For the remainder of the weekend, the best times to travel are Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.

    Listen to BaySpan
  48. 1:27 AMAll clear

    There are currently no backups approaching the Bay Bridge in either direction, and traffic is moving at normal speeds. For the remainder of the weekend, the best times to travel on Saturday are before 7 a.m. and after 5 p.m. On Sunday, recommended travel times are before 10 a.m. and after 10 p.m.

    Listen to BaySpan
  49. 1:27 AMAll clear

    There are currently no backups approaching the Bay Bridge in either direction, and traffic is moving at normal speeds. For the remainder of the weekend, the best times to travel on Saturday are before 7 a.m. and after 5 p.m. On Sunday, recommended travel times are before 10 a.m. and after 10 p.m.

    Listen to BaySpan
  50. 1:27 AMAll clear

    There are currently no backups approaching the Bay Bridge in either direction, and traffic is moving at normal speeds. For the remainder of the weekend, the best times to travel on Saturday are before 7 a.m. and after 5 p.m. On Sunday, recommended travel times are before 10 a.m. and after 10 p.m.

    Listen to BaySpan
  51. 12:27 AMAll clear

    Traffic is currently flowing normally in both directions on the Bay Bridge as of Saturday, February 28th at 12:30 AM. Travel times are consistent with typical conditions, and there are no reported backups or delays along the US 50 corridor.

    Listen to BaySpan
  52. 12:27 AMAll clear

    Traffic is currently flowing normally in both directions on the Bay Bridge as of Saturday, February 28th at 12:30 AM. Travel times are consistent with typical conditions, and there are no reported backups or delays along the US 50 corridor.

    Listen to BaySpan
  53. 12:12 AMConstruction

    Traffic is currently normal with no backups or delays on or approaching the bridge. As of 12:20 a.m. on Saturday, February 28th, the eastbound span is closed for road work. All traffic is being diverted to the westbound bridge, which is operating with one lane eastbound and one lane westbound. The center lane of the westbound bridge is closed to serve as a buffer.

    Listen to BaySpan
  54. 12:12 AMConstruction

    Traffic is currently normal with no backups or delays on or approaching the bridge. As of 12:20 a.m. on Saturday, February 28th, the eastbound span is closed for road work. All traffic is being diverted to the westbound bridge, which is operating with one lane eastbound and one lane westbound. The center lane of the westbound bridge is closed to serve as a buffer.